Warwick University: Work and social space for students
Eaton Timber Solutions were tasked by Warwick University to design a solution for an open work/social space for the students.
The awkward shape of the area meant that the work and design was done all up front, then the measurements and design was taken back to the factory for manufacture. Every top and seat was manufactured to fit, so no machining was done on site. This meant installation took just 2 days.